Pour la documentation en FRANÇAIS, utilisez l’outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.

This model is a distribution grid with 650 nodes with OLTC transformer and hundreds of time-variable loads. It can run in SSN at a time step in the 80-100µs range in real-time (depending on the real-time target).

References

C. Dufour, G. Sapienza, "Testing 750 node distribution grids and devices using optimized parallel delay-free real-time solvers and modern grid protocols" 2015 International Symposium on Smart Electric Distribution Systems and Technologies (EDST), Vienna, Austria, Sept. 8-11, 2015


  • No labels