Pour la documentation en FRANÇAIS, utilisez l’outil de traduction de votre navigateur Chrome, Edge ou Safari. Voir un exemple.

Once the VeriStand project has been successfully deployed, we can control and monitor the simulation. Open the Workspace file, Two Level Inverter.nivcscreen, from the Project Files tab in the VeriStand Editor to view the user interface.  Set U01_Vbat to 220V and manipulate the parameters of the SPWM generators to view the results in the Waveform graphs.

  • No labels