Installation

Follow this simple installation procedure. Make sure to respect proper grounding, as described in Connecting the Ground Screw

  • Place the OP5600 on a shelf or a desktop, or install in a traditional rack
  • Connect the power cable to the nearest power outlet
  • Connect the OP5600 to the same network used by the host PC, using the cables

Connecting the Ground Screw 
Anchor
ground
ground

You must connect a grounding cable from the OP5600 ground screw to the rack to ensure that the OP5600 terminates securely in a ground. Proper grounding helps prevent electric shocks, protects the OP5600 from voltage spikes (from a variety of causes, including lightning strikes), and provides increased immunity from EMI by lowering noise levels and emissions.

  • Select a flat braided grounding strap of adequate length (as short as possible provides the best protection), with ring terminals on each end
  • Attach one ring terminal to the ground screw on the OP5600 (shown in the figure below)
  • Attach the other ring terminal to the rack using a nut and lock washer

Image RemovedImage Added

Adding or replacing OP5300 mezzanine modules

Top view of mezzanines installed on carrierImage RemovedTop view of mezzanines installed on carrierImage Added


The top of the chassis can be removed to access the signal conditioning mezzanine boards modules installed on the carrier board. The layout and configuration location of the boards depend modules depends on the selected platform (which must be factory installed)platform selected :

  • If the system is configured with the Xilinx ML605 board (Virtex-6, ML605 FPGA board), there is a maximum of 6 signal conditioning mezzanines (these will be , installed in groups 1, 2 and 4 on the carrier board).
  • If the system is configured with the OP5142 board (Spartan-3), OP5142 signal conditioning board, there is a maximum of eight mezzanines allowed (as shown in the above schematic).

At power-up, the carrier will autodetect which mezzanines are installed mezzanines and transfer this information to the FPGA and the simulator.

...

Background Color
color#D3D3D3


Image RemovedImage Added

The system must be powered down before changing mezzanines. Failure to do so may damage the equipment.

Disconnect power before servicing.


...