Once the VeriStand project has been successfully deployed, we can control and monitor the simulation. Open the Workspace file, Dual PMSM VDQ Local Control.nivcscreen, from the Project Files tab in the VeriStand Editor to view the user interface.  Set the Speed Setpoint to 3000RPM and observe the resulting voltage and current waveforms as the machine runs.